Project Discipline: Civil, Structure, Mechanical, Electrical, and Instrumentation
Contract: AS 4300
The Sandy Creek Pressure Reducing Tank (PRT) is a deteriorated break pressure tank that reduces pressure within operational network to provide the supply to 100,000 customers.
This old infrastructure was built in 1940’s which requires immediate upgrade in all aspects of the existing asset.
The project includes design (including review, mark-up and re-work as required), supply, deliver, fabricate, install, construct, program, configure, inspect, test and commission all new and modified civil, structural, mechanical, hydraulic, electrical, control and SCADA services.
The construction phase of the project must be completed within three months only due to the limitation of operational network. Hence, this project requires thorough stakeholder and communication management