As part of SA Water RBP20 (and beyond) work, I led the engineering and long term asset planning works for the Glenelg, Aldinga, and Christies Beach Wastewater Treatment Plant (WWTP).

The objective of these projects was to determine how to manage each asset at its lowest life cycle cost. This engagement was to undertake a thorough engineering study such that risk can be identified and appropriately mitigated if/where required. This long term asset management work provided SA Water with a guide what systems to apply to the various assets to increase and/or improve its life, thus providing SA Water a guide on the financials the plant will require to be put aside for the next 25 years.